Skip to product information
1 of 6

NeoG

Neo G Opti-Heal Hydration Multi Purpose Dressing - Hydrogel Wound Dressing Pads for Advanced Wound Management - Ulcer Dressing, Bed Sore Bandages, Diabetic Wound, Burn Dressing Gel 4 x 4-4 Pcs

Neo G Opti-Heal Hydration Multi Purpose Dressing - Hydrogel Wound Dressing Pads for Advanced Wound Management - Ulcer Dressing, Bed Sore Bandages, Diabetic Wound, Burn Dressing Gel 4 x 4-4 Pcs

Regular price $23.99 USD
Regular price $23.99 USD Sale price
Shipping calculated at checkout.

About this item

  • LOOKING FOR HYDROGEL DRESSINGS FOR ADVANCED WOUND MANAGEMENT? Neo G gel wound dressing has been clinically developed to provide hospital grade adhesive bandage to use at home. Gel burn bandage hydrogel for everyday care and as first aid for burns, pressure ulcer wound care.
  • FASTER HEALING TECHNOLOGY medical dressing creates a moist environment, which helps accelerate healing and reduce pain and scarring. Used as moist burn pads, pressure wound bandages, ulcer bandages, wound care for diabetics.
  • SOOTHING, COOLING HYDRATION SYSTEM - Has a cooling and soothing effect on the skin. Ideal burn wound dressing for 1st & 2nd degree burn treatment, pressure wound bandage for bedsore wound care, ulcer wound care. Helps relieve pain and causes minimal skin damage.
  • HIGHLY ABSORBENT & EFFECTIVE hydrogel dressing featuring a translucent gel with excellent absorbability. Can absorb excessive wound exudate, maintain a moist healing environment, hasten epithelialization and reduce healing times.
  • WATERPROOF, TRANSLUCENT & FLEXIBLE: Translucent for easy wound observation with 360° showerproof seal that protects wound from dirt and germs. STERILE to prevent infection. Moves and flexes with your body for optimum comfort during everyday wear
View full details
  • ⭐️⭐️⭐️⭐️⭐️

    Anna L.

    “I absolutely love SelfCare! The shampoo and conditioner made my hair so soft and shiny. Plus, the packaging was beautiful and eco-friendly. Definitely worth every penny!”

  • ⭐️⭐️⭐️⭐️⭐️

    Mark R.

    “SelfCare never disappoints. My skincare set arrived in just two days, and everything smells amazing. You can really tell the products are made with quality ingredients.”

  • ⭐️⭐️⭐️⭐️⭐️

    Jasmine T.

    “I’ve tried so many personal care brands, but SelfCare is my favorite! The lotion absorbs quickly and keeps my skin moisturized all day. Fast shipping and excellent service too.”